Some checks failed
Build and Push Docker Images / changes (push) Has been cancelled
Build and Push Docker Images / build-backend (push) Has been cancelled
Build and Push Docker Images / build-frontend (push) Has been cancelled
Build and Push Docker Images / build-admin-frontend (push) Has been cancelled
140 lines
4.3 KiB
Markdown
140 lines
4.3 KiB
Markdown
# DreamWeaver Weekend Handoff - 2026-04-17
|
||
|
||
## Purpose
|
||
|
||
这份文档用于周末在另一台电脑上继续推进 DreamWeaver 时快速接手,不需要先重新阅读大量聊天记录或从工作区猜测上下文。
|
||
|
||
---
|
||
|
||
## What Is Already On Remote
|
||
|
||
当前远端 `main` 已经包含两个连续 checkpoint:
|
||
|
||
- Commit: `a97a2fe`
|
||
- Message: `feat: persist story generation states and cache audio`
|
||
|
||
这个 checkpoint 覆盖的主线如下:
|
||
|
||
- 新增并落地统一生成状态字段:
|
||
- `generation_status`
|
||
- `image_status`
|
||
- `audio_status`
|
||
- `last_error`
|
||
- Storybook 阅读页支持按 ID 恢复
|
||
- 故事列表页、故事详情页、绘本阅读页接入统一状态展示
|
||
- 音频首次生成后缓存落盘并可复用
|
||
- 统一状态语义中 `degraded_completed` 已和错误展示保持一致
|
||
|
||
- Commit: `b8d3cb4`
|
||
- Message: `wip: snapshot full local workspace state`
|
||
|
||
这个 checkpoint 已把 2026-04-17 晚间的工作区快照同步到远端,包括:
|
||
|
||
- 新增 `AGENTS.md`
|
||
- 整理 `docs/` 文档信息架构
|
||
- 新增求职版 PRD、统一生成工作流 PRD、Week 1 backlog 与文档盘点
|
||
- 归档旧 backend docs 到 `docs/archive/`、`docs/technical/`、`docs/operations/`
|
||
- 补齐 Storybook 带 ID 路由恢复相关前端改动
|
||
|
||
注意:`b8d3cb4` 是一次 WIP 快照提交,原始 diff 中包含大量行尾/格式噪音。继续开发时应以当前 `main` 代码与 `docs/` 中 Active 文档为准,不需要再回到 `a97a2fe` 重新整理。
|
||
|
||
---
|
||
|
||
## Current Local Status On 2026-04-18
|
||
|
||
2026-04-18 在个人电脑接手后已确认:
|
||
|
||
- 本地 `main` 与 `origin/main` 对齐到 `b8d3cb4`
|
||
- 工作树起始状态干净
|
||
- 已配置 Gitea HTTPS 推送凭据,并通过 `git push --dry-run origin HEAD:main`
|
||
- 后端本地虚拟环境可用:`backend/.venv`
|
||
- 主前端与管理端依赖已安装到各自 `node_modules`
|
||
|
||
---
|
||
|
||
## Recommended Reading Order
|
||
|
||
周末继续前,建议先阅读:
|
||
|
||
1. `docs/product/job-search-relaunch-prd.md`
|
||
2. `docs/product/unified-generation-workflow-prd.md`
|
||
3. `docs/planning/week-1-execution-backlog.md`
|
||
4. `docs/planning/document-status-inventory.md`
|
||
|
||
---
|
||
|
||
## Environment Setup On The Next Machine
|
||
|
||
建议接手后先完成以下动作:
|
||
|
||
1. `git pull`
|
||
2. `cd backend && alembic upgrade head`
|
||
3. `cd backend && .venv/bin/python -m pytest -q`(macOS/Linux)
|
||
4. `cd frontend && npm install`
|
||
5. `cd frontend && ./node_modules/.bin/vue-tsc --noEmit`
|
||
|
||
如果主前端完整构建失败,优先检查 Rollup 可选原生包是否正常安装,而不是先怀疑本轮代码逻辑。
|
||
|
||
---
|
||
|
||
## Current Product / Engineering Position
|
||
|
||
当前阶段不是“继续加功能”,而是把 DreamWeaver 收敛成可讲述、可演示、可恢复的求职版产品。
|
||
|
||
已经完成的关键支点:
|
||
|
||
- 状态模型已落地,不再只是文档概念
|
||
- Storybook 恢复能力已补上
|
||
- 音频体验开始形成闭环
|
||
|
||
还没完成的关键工作:
|
||
|
||
- 普通故事、完整生成、绘本生成仍是多条 service 路径
|
||
- 缺少统一资产重试入口
|
||
- 缺少更清晰的统一 workflow 编排边界
|
||
- admin-frontend 范围和 Provider 边界仍未收束
|
||
|
||
---
|
||
|
||
## Best Next Step
|
||
|
||
周末最值得继续做的第一优先级:
|
||
|
||
### P0: 统一资产补全过程
|
||
|
||
目标:
|
||
|
||
- 抽出封面生成和音频生成的共同步骤
|
||
- 让图片 / 音频共享一套资产状态回写逻辑
|
||
- 为后续“统一重试入口”打基础
|
||
|
||
为什么先做:
|
||
|
||
- 它直接承接已经落地的状态模型
|
||
- 它比继续加页面更能体现系统设计能力
|
||
- 它能把当前三条生成路径往统一 workflow 再推近一步
|
||
|
||
### P1: 统一重试入口
|
||
|
||
目标:
|
||
|
||
- 至少设计出一个清晰的 retry API 方向
|
||
- 即使不一次性重命名为 `/api/generations/...`,也先做到内部统一
|
||
|
||
### P1: 收敛 service workflow
|
||
|
||
目标:
|
||
|
||
- 梳理普通故事 / 完整生成 / 绘本生成的共同步骤
|
||
- 把“验证上下文 -> 生成主内容 -> 保存主记录 -> 补全资产 -> 状态回写”整理成更明确的共享流程
|
||
|
||
---
|
||
|
||
## Important Reminder
|
||
|
||
如果周末是在另一台电脑上继续,不要默认“今天下午所有本地修改”都已经上远端。当前最可靠的 source of truth 是:
|
||
|
||
- 远端代码:以 commit `b8d3cb4` 为准
|
||
- 产品目标:以 `docs/product/job-search-relaunch-prd.md` 为准
|
||
- 当前执行主线:以 `docs/product/unified-generation-workflow-prd.md` 与 `docs/planning/week-1-execution-backlog.md` 为准
|